Permit Application Process
When a permit is required, it is necessary to provide at least three (3) sets of plans to the building department for review. After the plans are reviewed and approved, the applicant will get a set returned to him/her which has a stamp of approval from the building department. This approved set of plans must remain on the job site for the duration of the project. These plans must be available to the inspector, or inspections will not be performed. The second set of approved plans is retained by the building department.

Submitted documents shall reflect all proposed work. Plans shall be clear enough such that if you were to hand them to a complete stranger, he/she would be able to construct the project as you intend.

Most commercial projects, as well as any construction that does not meet the requirements for "Conventional Light-Frame Construction" as specified in Chapter 23 of the California Building Code (CBC), must be designed, and all plans and documents stamped, by a qualified architect or engineer licensed by the State of California.
     
     
     
    City of Taft
    209 E. Kern St Taft, CA 93268
    Phone: (661) 763-1222  |   Fax: (661) 765-2480
    Home  |  Contact Us  |  Site Map  |  Accessbility  

    Government Websites by MunicipalCMS
    E-notify RSS Feeds Twitter Facebook 
    0